A Shelter Island building permit needs two sets of stamped architect or engineer plans, a survey and an energy certificate that lists window U-factors. The Town allows accessory apartments under § 133-17 if the owner lives in one unit, the lease is year-round for at least a year, and Suffolk County Health approves water and sewage first.

  • Egress Windows From $5,900
  • Most Installs in One Day
  • Licensed in Nassau and Suffolk
  • Free Onsite Estimate

Get a Price for Your Basement

Tell us about your basement and we will get back to you to set up a free onsite estimate.

Egress windows from $5,900, entrances from $12,000. See your price

Suffolk County

Town of Shelter Island at a Glance

Who issues the permit, what the town says about basement apartments, and where the building department is. The sources are listed under the table.

Town of Shelter IslandSuffolk County
Building departmentTown of Shelter Island Building Department
38 North Ferry Road, Shelter Island, NY 11964
(631) 749-0772
Monday to Friday, 8 AM to 4 PM
Egress window permitThe building permit application asks for two sets of stamped architect or engineer plans, a survey (which may be waived for interior work), an energy certificate listing window U-factors, and Suffolk County Health approval where required.
Basement apartmentsAllowed with conditions. Allowed under Town Code § 133-17 if the owner lives in one unit, leases are year-round for at least a year, the unit is 480 sq ft or more with up to two bedrooms, and Suffolk County Health approves water and sewage. New licenses are capped each year.
Areas we coverShelter Island, Shelter Island Heights, Dering Harbor

Sources: Town of Shelter Island Code, § 133-17 accessory apartments; Town of Shelter Island, Building Permit Application, July 2025; Town of Shelter Island, Building Department; Suffolk County Department of Health Services, residential wastewater permits

Working with the Shelter Island Building Department

Plans come first, then the window. Shelter Island’s building permit application, revised July 1, 2025, is specific about what comes with it, and most of it applies to an egress window:

  • Two sets of plans stamped by an architect or engineer (more on the permit process for egress windows).
  • A survey, which the Town may waive for interior work that doesn’t affect setbacks. A new foundation opening and an outside well are exterior work, so plan on one.
  • An energy certificate with the window U-factors, which means the window has to be chosen before you file.
  • Suffolk County Health approval where it’s required.

On waterfront or low-lying lots, the survey must show flood zone boundaries for new construction. The Building Department is at 38 North Ferry Road, (631) 749-0772, Monday to Friday 8 to 4.

New egress casement window set in an unfinished basement wall, with the well outside

Accessory Apartments Under § 133-17

News 12’s August 2026 summary listed Shelter Island as allowing basement apartments with permits. The Town Code allows accessory apartments in every district, with conditions. The owner lives in one of the units. Leases are year-round, one year or longer. The apartment is at least 480 sq ft with no more than two bedrooms. The license renews every two years with an inspection, and the Town caps new licenses each year. New apartments aren’t allowed in the Near Shore and Peninsula Overlay District.

The code doesn’t address basements. Whether a basement unit can meet the 480 sq ft minimum and the rest is a question for the Building Department before it’s one for us.

View from the basement through a newly cut opening, with a crew member digging outside

Water and Sewage Come First

Shelter Island won’t issue an apartment license until Suffolk County Department of Health Services has approved water and sewage. The county has a separate accessory apartment application, form WWM-105, through its Office of Wastewater Management in Hauppauge, (631) 852-5700. Build that review into your timeline. It’s a separate office from the Town, and the license waits on it.

Double-hung egress window with a parged surround and a white-rimmed window well

Shelter Island Heights and Dering Harbor

Shelter Island and Shelter Island Heights file with the Town. Dering Harbor is an incorporated village with its own rules, so check there first if your house is inside the village. Across the water, Southold and East Hampton each run their own departments, and the East End page compares all five towns.

Double-hung egress window in a green basement wall, with fresh patching around the opening

The Work

The egress window itself is held to the same state minimums as the rest of Long Island (what an egress window install involves): 5.7 sq ft of net clear opening (5.0 only for a grade-floor opening), 24 inches high and 20 wide at minimum, sill no higher than 44 inches, and a well at least 9 sq ft with 36 inches of projection. Wells deeper than 44 inches need a ladder or steps. Most egress window installs take one day. The wall and the weather can add time, and the schedule comes with your quote.

Egress windows start at $5,900 installed with a masonry well, $6,500 with a Boman Kemp galvanized steel well and $8,900 with a Cambridge ArmorTec well up to 40 inches deep ($1,100 per extra 12 inches). A basement entrance is $12,000 to $15,000 (how we price an egress window). The window you choose also goes on the energy certificate, so the model has to be picked before you file. Read the NY egress requirements and the apartment rules by town, then call (516) 390-8891.

Double-hung egress window in a finished drywall basement wall
FAQ

Questions We Get Asked

Don't see your question? Call or text (516) 390-8891 and ask us.

How big must an accessory apartment be on Shelter Island?

At least 480 sq ft, with no more than two bedrooms, under Town Code § 133-17. The owner has to live in one of the units, and leases run year-round for at least a year. The code doesn't address basements, so whether a basement unit can meet the size rule and the rest is a question for the Building Department.

Can I add an accessory apartment anywhere on Shelter Island?

Almost. The Town allows accessory apartments in every district, except that new ones aren't allowed in the Near Shore and Peninsula Overlay District. The Town also caps how many new licenses it issues each year, and Suffolk County Department of Health Services has to approve water and sewage before a license is issued.

How often is a Shelter Island apartment license renewed?

Every two years, with an inspection, under Town Code § 133-17. Expect the inspector to look at the unit itself, so keep each bedroom's egress window able to open fully and its well clear of leaves, snow and stored items. A blocked well is one of the easier problems to fix before the visit, and one of the more serious to leave.

Does my survey need to show the flood zone?

For new construction on waterfront or low-lying lots, yes. The Town's July 2025 building permit application says the survey must show flood zone boundaries. A survey may be waived for interior work that doesn't affect setbacks, but a new foundation opening with a well outside is exterior work, so plan on supplying one.